Request a Quote
Home · Factory & quality

Factory & quality

The EMC chamber being ours is the whole point. A borrowed lab slot turns a layout problem into a month; here it turns into an afternoon.

Production floor

How an order runs

Platform products you can take to market in weeks rather than quarters. Every one accepts your housing colour, logo, packaging and firmware behaviour.

Process

01

SMT & AOI

Four lines with 100 % automated optical inspection after reflow — no sampling on the boards.

02

Ageing rack

48 hours powered at load before packing, so infant failures happen here rather than at retail.

03

EMC chamber

On site. When a pre-scan fails we change the layout the same week instead of booking a lab three weeks out.

04

AQL & packing

AQL 1.0 inspection, retail packaging and FBA labelling applied in line.

Testing before it ships

On site. When a pre-scan fails we change the layout the same week instead of booking a lab three weeks out.

ISO 9001IECEE CB schemeUN38.3RoHS / REACHQC080000DoE VI
Testing